active power filter
Where should the power factor correction equipment be installed
Jun 16, 2018
After determining the required size capacitor in kVAr, the next step is to decide on the
location for installation of the capacitor bank.
It is difficult to set definite guidelines for location of capacitor installation. However, the
following general rule should be kept in mind: As close as possible to the load to be
compensated.
Send a Message
welcome to zddq
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

about

contact